Alerts:
PHASE-II DEVELOPMENT WORK UPDATES.......... CONSTRUCTION OF ROADS AND OVERHEAD WATER TANKS, LAYING OF SEWERAGE SYSTEM, WATER SUPPLY DISTRIBUTION AND TREE PLANTATION WORKS ARE IN PROGRESS AND MONITERED ON DAILY BASIS..........    

Phase 2

IT WAS GENERAL DEMAND OF OVERWHELMING MAJORITY OF THE EMPLOYEES IN THE 11th AGM HELD ON 16-03-2002 TO START PHASE II. PRESIDENT NFC-ECHS CONSTITUTED A COMMITTEE TO CARRY OUT PRELIMINARY STUDY ON PHASE-II. ON SUBMISSION OF REPORT BY THE COMMITTEE , A PERFORMA WAS CIRCULATED TO THE EMPLOYEES TO ASSESS THEIR GENERAL DEMAND. A HIGHLY ENCOURAGING RESPONSE WAS RECEIVED WHICH BECAME THE BASIS OF THE START OF PHASE II 
 
LAND FOR PHASE-II HAS BEEN REQUIRED AT LAHORE BEAUTIFUL CANAL BANK NEAR MARAKA HAVING AN APPROACH   TO MULTAN ROAD, LAHORE . WHERE 24HOURS PUBLIC TRANSPORT AVAILBALE.
 
ALL THE FACILITIES/AMENITIES OF PRESENT TIME BE AVAILABALE LIKE; 
 
•  MAXIMUM PARKS AND GREEN AREA.
 
•  HOSPITAL, SCHOOL, CLUB, COMMUNITY CENTRE, MOSQUES AND WIDE ROADS ETC. 
 
•  BEST SEWERAGE AND WATER SUPPLY SYSTEM. 
 
•  LATEST UNDERGROUND ELECTRIFICATION SYSTEM.
 
•  COMMERCIAL CENTER , CIVIC CENTRE, TELEPHONE, CABLE AND GAS ETC. 
 
AFTER ACQUIRING LAND FOR PHASE-II CONSTRUCTION WORK OF BEAUTIFULLY DESIGNED MAIN GATE AND BOUNDARY WALL COMPLETED. THE MAIN ACTIVITIES OF DEVELOPMENT WORKS BEING FOLLOWED. 
© Copyrights 2018 NFCECHS. All Rights Reserved.